- Dinah, Erepada O., Ihuah Paulinus W. and Elenwo, Ekwuru
- DOI: 10.5281/zenodo.22704793
- SSR Journal of Multidisciplinary (SSRJM)
Cost overruns remain a major challenge
affecting the financial viability and successful delivery of residential
property development projects. This study examined the factors influencing cost
overruns and the strategies for managing them in the Port Harcourt metropolis,
Rivers State, Nigeria. A cross-sectional mixed-methods design was adopted,
combining a questionnaire survey with semi-structured key informant interviews.
Quantitative data were obtained from 86 professionals and stakeholders selected
through stratified simple random sampling, while five experienced
built-environment professionals were purposively interviewed. Questionnaire
data were analysed using descriptive statistics and the Relative Importance
Index, while qualitative data were analysed thematically. The findings revealed
that fluctuation in construction material prices was the most influential
factor contributing to cost overruns (RII = 1.000), followed by inflation and
macroeconomic instability (RII = 0.993), delayed payment for completed work
(RII = 0.988), and inaccurate quantity estimation (RII = 0.963). Other
important factors included frequent scope changes, poor site and contract
management, material shortages, procurement delays, design errors and
inadequate site supervision. Realistic and accurate cost estimation was
identified as the most effective management strategy (M = 4.721), followed by
the use of advanced technology (M = 4.349), risk assessment and contingency
planning (M = 4.186), and detailed budgeting (M = 4.081). The study concludes
that cost overruns result from the interaction of economic instability,
financial constraints, estimation deficiencies, and weak project management. It
recommends realistic cost estimation, timely project financing, effective
material procurement, technological cost monitoring, competent contractor
selection, and strict adherence to the approved project scope.
Keywords: cost overrun,
residential property development, construction materials, cost estimation,
project management.